By continuing your visit to this site, you accept the use of cookies by Google Analytics to make visits statistics. Read more
Simultaneous (converging) Independent Approaches
An approach operation permitting ILS/RNAV/GLS approaches to non-parallel runways where approach procedure design maintains the required aircraft spacing throughout the approach and missed approach and hence the operations may be conducted independently.